Technical employee at Petro Service GmbH, Steinbach, Taunus
April 1990 – March 1993
Projects: Vinyl chloride plant and water treatment, Deutsche Solvay Werke, Rheinberg
Independent planning / construction and project development for measuring and control plants with regard to the treatment of chemical product, cost control, logistics and orders for erection material, coordination of erection personnel, compliance with the explosion protection procedures, review work, monitoring of encapsulation work in production facilities, dynamic simulation of process groups, processing of measurement signals from programmable control systems and process technology.
Technical employee at EMR-Anlagentechnik GmbH, Friedrichsdorf/Taunus
March 1988 - March 1990
Projects:
- Production line dolantine, cephalosphorin, human Insulin as well as test run for artifical insulin, Hoechst AG, Frankfurt/Main
Planning and construction of measuring and instrumentation plants for the pharmaceutical industry, group management, apprentice training, instruction of operators, expansion and new development of control devices, cost calculation of graphical and erection work, simulation of measurement circuits, current analysis, automation of part of the production sections by saving programmable control devices, computer process control, maintenance of documentation, CAD.
Specialist electrical assembly operator at Klaus Reinders GmbH, Essen
Mai 1987 - Febr. 1988
Projects:
- Aachen Clinic Centre, Thyssen Stahl AG Duisburg, VEBA Gas Herne, VEBA Öl Gelsenkirchen, STEAG Kraftwerk Duisburg-Walsum, Ruhr Gas Essen
Erection and commissioning of electrical control units in hospitals, steel-works, power stations, electrical control cabinet construction, installation of low- and medium-voltage switch gears in power stations and control rooms in the steel processing industry, installation of intercommunication systems, heating, air-conditioning and ventilation systems, measuring and instrumentation distributors, erection work for coal gasification plants.
Education as Foreman in the field of Electrical Engineering.
Successful examination for the degree of Master and training supervisor.
Oct.1986 - March 1987
Management at Akademie Essen
Electrical Service Engineer and Team Leader at PSE GmbH, Bochum
Jan. 1985 - Sept. 1986
Projects:
- Exhibition halls and office centres in Frankfurt/Main
- Mannesmann Duisburg
- Krupp Stahl AG Essen
- Thyssen Engineering Duisburg
- Degussa AG Duisburg
- Heizkraftwerk Heilbronn am Neckar, Block 7
Installation and commissioning of electrical control systems in steel-works, power stations, switchboard cabling for distribution and lighting systems as well as for crane and lift control, expansion of low and medium voltage switch gears, installation of control rooms, building control systems, fire alarm systems, elevataor control, HKL control, office and hotel installations.
Electrical Service Engineer at Weinzetl & Hinssen GmbH in Rösrath
April - Dec. 1984
Projects:
- Phosphorus Elimination Plant in Berlin-Tegel, Coal-fired Group Power Plants I + II, Berlin-Gatow
Installation and scommissioning of control systems in a power station and in a special sewage plant, subsequent work for servo-motors, transducers and measuring and instrumentation splitters, switch board cabling for power distributions and lighting systems, installation of low-voltage switch gears in a sewage treatment plant.
Electrical Service Engineer at Werner & Schäfers GmbH, Recklingausen
Jan. - April 1984
Project:
- Bus- and Tram depot, Recklinghausen
Installation of lighting fittings, ELA systems, intercommunication systems, switch board cabling for power distribution and lighting systems.
German Federal Armed Forces
Oct.1982 - Dec. 1983
15 months basic military service (Naval Pilot Squadron I)
Electrical Service Engineer at Werner & Schäfers GmbH, Recklinghausen
Febr. 1981 - Sept. 1982
Projects:
- Model secondary school centre, Cologne-Monheim, JVA Bochum, St.Vincenz-Hospital Essen, Gelsenkirchen Theatre, Cologne-Ostheim Sports Centre
Installation of high and low tension systems, in particular lighting fittings, nurse calling systems, intercommunication systems, electrical equipment for surgery rooms, implementation of electrical control systems in hospitals, nursing homes and sports halls, switch board construction for power distribution and lighting control.
Education as Electricain at Heimeshoff GmbH, Bochum
Aug. 1977 - Jan. 1981
Projects:
Installation of high and low tension systems in old and new buildings, residential and commercial buildings, department stores, supermarkets, hospitals, retirement homes and halls of residence, customer service centre, work in industrial plants.